Charley S. Snyder |
Construction Estimator/CM-A |
2240 Shelter Island Dr., Ste 102, San Diego, CA 92106 |
charley@charleyssnyder.com, www.charleyssnyder.com |
Phone 760.884.4642 |
Resume |
Employment History |
|
Construction Chief ESTIMATOR/CM-A: 2240 Shelter Island Dr., Ste 102. San Diego CA 92106 |
17-Pres |
|
Construction Coordinator: Amerit/Port of San Diego |
09/2019 |
|
Construction Chief ESTIMATOR: 821 Dock Street, Tacoma, WA 98402 |
11-17 |
|
|
|
|
|
|
ESTIMATOR: J. R. Hayes &
Sons, 22430 SE 231st, Maple Valley, WA |
07-09 |
|
|
Takeoff's/quotes for earthwork (100,000 to 6.0M) using
Paydirt, Execl, ACAD Lt 2009, & HeavyBid |
|
|
|
|
Projects: |
Avalon Towers, Bellevue, WA |
|
|
|
|
|
Lawson Hills Spoils Pile, Pierce Co, WA |
|
|
|
|
|
Korry Electronics, Paine Field, WA |
|
|
|
|
|
Garage Billiards, Seattle, WA |
|
|
ESTIMATOR: Signature
Custom Homes, 3217 Meridian Ave. East, Suite A, Edgewood, WA |
06-07 |
|
|
Schedules, Plan and Specification Review, Project pricing, and Management for high end residential construction. |
|
|
ESTIMATOR: Lindal Cedar
Homes, 4300 S. 104th Pl., Seattle, Seattle, WA |
05-06 |
|
|
Material take-offs for
semi-custom high end residential construction. |
|
|
ESTIMATOR: Exterior Metals, Inc., 9623 - 32nd Ave., Court C, Lakewood, WA |
05-05 |
|
|
Prepared quotes for
sheet metal (Div 07). Quotes ranged in size from 25,000 to 300,000 |
|
|
ESTIMATOR: Tech-Fast Metal Systems, 615 Commerce St., Tacoma, WA |
02-04 |
|
|
Prepared
quotes for self-storage buildings (nationwide). Projects ranged in size
from 50,000 to 1.0M |
|
|
PROJECT ENGINEER: Lugo
Construction, 6423 Pacific Hwy East, Fife, WA |
00-02 |
|
|
Prepared schedules,
contracts, submittals, and conducted project meetings. Participated in the
successful completion of 5 projects with a total value of +/-15M. The
projects included 100,000cy in earthwork, 60,000sf in steel structures.
Additionally, the work included: (5) foundations (1) tilt-up concrete, (2)
structural steel frames, and (2) wood frames. |
|
|
|
|
Projects: |
First Samoan Congregational Church, Tacoma, WA |
|
|
|
|
|
usty Strings Manufacturing Building,
Seattle, WA |
|
|
|
|
|
Sea Mar Medical Office Building, Bellingham, WA |
|
|
|
|
|
Sea Mar Medical Office Building, Marysville, WA |
|
|
|
|
|
Parr Ford Auto Dealership,
Bremerton, WA |
|
|
ESTIMATOR: Lindal Cedar Homes,
4300 S. 104th Pl., Seattle, WA |
99-00 |
|
|
Material take-offs for
semi-custom high end residential construction. |
|
|
ESTIMATOR: The Eagle Group,
Inc., 710 South Faucet, and Tacoma, WA. |
95-97 |
|
|
Estimated, prepared schedules,
solicited bids, prepared budgets, awarded subcontracts and prepared
subcontracts for the construction of in-store branch banks (Wells Fargo and
First Interstate). We constructed about thirty- five in 14 months. |
|
|
EARTHWORK ESTIMATOR, GRADE
ENGINEER, Site Super: Uniline Const, Tacoma, WA |
95-97 |
|
|
Estimated earthwork quantities
with AGTEK computer products. Projects ranged in size from 60,000 to
450,000cy. Prepared and submitted the bid proposals. Preformed grade
engineering. Set up computer hardware and software. |
|
|
|
|
Projects: |
Sunset
Blvd, road extension, Puyallup, WA |
|
|
|
|
|
Walmart, Bremerton, WA |
|
|
|
|
|
Mariweather
National Golf Course, Hillsboro, OR |
|
|
ESTIMATOR, CONSTRUCTION MGR:
Snyder Enterprise, Kennewick, WA |
89-95 |
|
|
Gregory Snyder, Kennewick, WA |
|
|
|
|
Conducted project feasibility
study, preformed project cost analysis, awarded subcontracts and supervised
the construction of a 2400sf single family residence. Project was built within budget. |
|
|
|
Theil / Burgdorff Medical Office
Building, Kennewick, WA |
|
|
|
|
Preformed a conceptual estimate
for the purpose of obtaining a loan. The project was a 1.1M medical office
building. |
|
|
|
S.F. Fortune Property, dba The Hotel Hamilton, Oakland, CA |
|
|
|
|
Estimated the cost for the
seismic rehab of a seven story hotel (formerly the Oakland YMCA). Obtained a
$130,000 interim loan for the 2.0M Project |
|
|
|
Western Commercial Partnership
I, dba Webster Tower and Terrace, San
Francisco, CA |
|
|
|
|
Estimated the cost to complete
for a 14 story residential / commercial high rise. Obtained an additional
4.0M loan. Closed 30 lien escrows in the total amount of 1.0M. Supervised
the completion of 1.5M in tenant improvements. |
|
|
LOAN ADMINISTRATOR, DEPT MGR: Mercury Savings, Cupertino, CA |
84-89 |
|
|
|
Performed residential,
multifamily and commercial project cost estimates. Over 300 projects--ranged in size
from 1.0M to 24.0M. Created cost database using past projects. Preformed
construction inspections. Authorized construction disbursements (4.0M per
month). Supervised staff of six personnel. Administered fifty major
construction loans per year. One of the larger loans was for the historic
renovation of Dufwin Theatre |
|
|
|
|
|
|
|
|
|
|
|
...Additional work history
available upon request... |
|
|
|
|
|
|
|
|
ENGINE ROOM
SUPERVISOR: US Navy, Pearl Harbor, Hawaii. |
62-69 |
|
|
|
Machinist Mate 2nd Class, Submarine and S5W nuclear power plant qualified. Served on: USS
Entemedor (SS340) and the USS
Plunger (SSN595). |
|
|
|
|
|
|
|